Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›First Steel Cut on Nexans CS Aurora
Business & Finance

February 19, 2019 · about 7 years ago

First Steel Cut on Nexans CS Aurora

The construction of Nexans’ new DP3 cable laying vessel CS Aurora is progressing with the cutting of the first steel. The hull is being built at Crist, Poland, while the engineering, outfitting and system integration, equipment preparations, testing, sea trials and finalising will be carried out at

1 minutes read
  • LinkedIn
  • X
  • Email

The construction of Nexans’ new DP3 cable laying vessel CS Aurora is progressing with the cutting of the first steel.

The hull is being built at Crist, Poland, while the engineering, outfitting and system integration, equipment preparations, testing, sea trials and finalising will be carried out at Ulstein Verft, Norway.

The ST-297 CLV is designed by Skipsteknisk.

The shipbuilding contract of Nexans next flag ship was announced in July, 2018

The vessel will be outfitted for power cable laying, including bundle laying, cable jointing, repair, cable system protection and trenching.

It will be delivered in 2021.

“ This is a proud moment for Nexans and an important milestone for the organization. With this modernization we will further strengthen our ability to deliver green power for the future ”, said Vincent Dessale , senior executive VP Subsea and Land Systems Business Group at Nexans. “ Aurora will play a key role in the installation of our cutting-edge submarine cables to help bring more energy to the world, connect offshore wind farms to the grid, support electrification of offshore petroleum installations and create interconnectors between countries. ”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago