Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Nexans cuts first steel for its cable layer C/S Aurora
Equipment

February 19, 2019 · about 7 years ago

Nexans cuts first steel for its cable layer C/S Aurora

French offshore cabling specialist Nexans’ on Monday saw the first steel cutting ceremony for its new DP3 cable laying vessel, the C/S Aurora.

1 minutes read
  • LinkedIn
  • X
  • Email

French offshore cabling specialist Nexans on Monday saw the first steel cutting ceremony for its new DP3 cable laying vessel, the C/S Aurora.

The hull is being built at Crist, Poland, while the engineering, outfitting and system integration, equipment preparations, testing, sea trials and finalizing will be carried out at Ulstein Verft, Norway. The ST-297 CLV is designed by Skipsteknisk.

Knut Flage , Vessel Operations Manager in Nexans, started the steel cutting process in the presence of representatives from Nexans, Crist and Ulstein Verft.

“This is a proud moment for Nexans and an important milestone for the organization. With this modernization we will further strengthen our ability to deliver green power for the future”, said Vincent Dessale , Senior Executive VP Subsea and Land Systems Business Group at Nexans.

“Aurora will play a key role in the installation of our cutting-edge submarine cables to help bring more energy to the world, connect offshore wind farms to the grid, support electrification of offshore petroleum installations and create interconnectors between countries,” he said.

The shipbuilding contract of Nexans’ cable layer was announced in July, 2018. The 149.9 meters long vessel will be outfitted for power cable laying, including bundle laying, cable jointing, repair, cable system protection and trenching. It will be delivered in 2021.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Equipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago

Red Rock commissions Nexans Electra’s crane systems
Business Developments & Projects

Red Rock commissions Nexans Electra’s crane systems

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago
Red Rock commissions Nexans Electra’s crane systems
Business Developments & Projects

Red Rock commissions Nexans Electra’s crane systems

about 3 months ago