Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Vale Prepares for Paraopeba River Dredging
Dredging

February 20, 2019 · about 7 years ago

Vale Prepares for Paraopeba River Dredging

Vale, a Brazilian mining company, is moving ahead with emergency projects to implement measures for containing the tailings coming from Dam I of the Córrego do Feijão Mine, located in Brumadinho, Minas Gerais, Brazil. In Section 1 of the plan, in the affected 10-km stretch that extends from Dam 1 to

1 minutes read
  • LinkedIn
  • X
  • Email

Vale, a Brazilian mining company, is moving ahead with emergency projects to implement measures for containing the tailings coming from Dam I of the Córrego do Feijão Mine, located in Brumadinho, Minas Gerais, Brazil.

In Section 1 of the plan, in the affected 10-km stretch that extends from Dam 1 to the Paraopeba River, running along the Ferro-Carvão Stream, the company is cleaning the area where there will be a dike (consisting of blocks of compacted rock) for the retention of the thicker and heavier tailings.

In parallel, the transport and storage of rocks that will be used in the construction of the structure is in progress.

In Section 2, in a 30 kilometer area that stretches from the meeting of the Ferro-Carvão stream with the Paraopeba River to the City of Juatuba, as defined in the emergency plan, Vale is mobilizing and installing equipment that will be used to dredge the coarsest debris, like sand and stones.

The main objectives are the cleaning and the de-sanding of the Paraopeba River channel.

According to Vale, the residue will be collected by two dredgers and will be disposed of properly, outside of the Permanent Preservation Area (APP) of the river.

All initiatives are being widely discussed with the competent agencies before their implementation, and that the ongoing activities are being properly released by the Fire Service and Civil Defense, said the company.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free