Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Aker Solutions to Develop Nova Field Digital Duplicate
Business & Finance

February 22, 2019 · about 7 years ago

Aker Solutions to Develop Nova Field Digital Duplicate

Aker Solutions has been appointed by Wintershall to build a complete digital replica of the Nova production system to enable data driven engineering, production and maintenance decisions. Through two separate agreements, Aker Solutions will provide both a fully interactive digital replica of the int

2 minutes read
  • LinkedIn
  • X
  • Email

Aker Solutions has been appointed by Wintershall to build a complete digital replica of the Nova production system to enable data driven engineering, production and maintenance decisions.

Through two separate agreements, Aker Solutions will provide both a fully interactive digital replica of the integrated production system as well as undertake a study to enable live data streaming and condition monitoring of the subsea equipment.

The digital twin will become an advanced replacement to traditional paper-based handbooks and equipment documentation, ensuring that all relevant engineering data is held centrally in a single, interactive and searchable solution. It will be built on a cloud-based architecture capable of processing live data and ensuring that vital engineering information is kept up to date at all times.

The connected study to enable live data streaming from the subsea production equipment will be instrumental in driving forward real time subsea condition monitoring, production optimization and predictive maintenance for the field.

“ These ground breaking pieces of work will ensure that the Nova field operates as a truly digital asset ,” said Are Føllesdal Tjønn , Head of Software Development for Aker Solutions. “ We are delighted to work with our customer to support the realization of their ambitious digital plans and to help set new standards for the energy industry .”

Nova was discovered in 2012 and is situated in the Quadrant 35 area in the Norwegian North Sea. Aker Solutions was awarded the contract to deliver the subsea production system for the field in early 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceProject & TendersResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago