Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Rye Harbor Federal Navigation Project on the Table
Dredging

February 26, 2019 · about 7 years ago

Rye Harbor Federal Navigation Project on the Table

The U.S. Army Corps of Engineers, New England District is proposing to perform maintenance dredging of the Rye Harbor Federal navigation project (FNP) in Rye, New Hampshire. The state of New Hampshire is the local sponsor and has requested this dredging. Rye Harbor is a small, 40-acre estuarine emba

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District is proposing to perform maintenance dredging of the Rye Harbor Federal navigation project (FNP) in Rye, New Hampshire.

The state of New Hampshire is the local sponsor and has requested this dredging.

Rye Harbor is a small, 40-acre estuarine embayment located approximately five miles south of Portsmouth Harbor and 13 miles north of the Merrimack River.

The Rye Harbor FNP consists of a channel that is 100 feet wide and 10 feet deep at mean lower low water, extending 600 feet through the entrance between the outer breakwaters and then becoming 8 feet deep for another 1,700 feet to the state pier and boat ramp in the inner harbor.

“ Hyrdographic surveys have shown severe shoaling within the Federal channel and the associated anchorages since the previous maintenance dredging in 1990, creating a hazard to vessels using Rye Harbor ,” said Project Manager Mr. Michael Walsh , of the Corps’ New England District, Programs/Project Management Division in Concord, Mass. “ Maintenance dredging would require the removal of 50,000 cubic yards of silt and fine-sand, to bring the Federal navigation project to its authorized dimensions .”

Dredging will be performed during a 3-4 month period between Nov. 1 and April 30, during the year or years in which funds become available. The dredge material has been determined to be suitable for unconfined open-water placement and will be placed by scow at either the Isles of Shoals North Disposal Site or the Cape Arundel Disposal Site.

Public comments on this proposed dredging project should be forwarded to the U.S. Army Corps of Engineers, New England District, Programs/Project Management Division no later than March 27, 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free