Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›Sparrows Handles Hornsea One Cables
Storage

March 4, 2019 · about 7 years ago

Sparrows Handles Hornsea One Cables

Sparrows Group Cable and Pipe Lay Solutions (CPLS) division has delivered its largest renewables project through three contracts related to the 1.2GW Hornsea Project One offshore wind farm. The three contracts were awarded through Boskalis (formerly VBMS), DEME Offshore (formerly known as Tideway),

2 minutes read
  • LinkedIn
  • X
  • Email

Sparrows Group Cable and Pipe Lay Solutions (CPLS) division has delivered its largest renewables project through three contracts related to the 1.2GW Hornsea Project One offshore wind farm.

The three contracts were awarded through Boskalis (formerly VBMS), DEME Offshore (formerly known as Tideway), and DeepOcean.

The work scope saw Sparrows provide equipment and personnel to handle the nearshore, export, and inter-array cables for the Hornsea One offshore wind farm.

Under construction at the site located 120km off the UK’s Yorkshire coast, Hornsea One is poised to be the world’s largest offshore wind farm when fully operational in 2020.

Working with Boskalis, a specialist team of personnel installed and operated two 10Te cable tensioners and one 15Te tensioner to transfer three 245kV export cables from the vessel NDurance to the landfall location. Bespoke track pads were used to ensure cable clamping limits were maintained for the duration of the pull-in activities and Sparrows provided sea fastenings packages for the equipment.

The company also supported DEME Offshore with the installation of the three export cables offshore to the Reactive Compensation Station (RCS) and onto the three substations using a 36Te 4-Track Tensioner. It is the longest AC offshore wind export cable system ever to have been installed.

The equipment was integrated into the Connector cable lay vessels’ lay spread system and used for spooling and laying activities for over 300km of cable. Data from the tensioners was logged and fed to the clients monitoring software by serial output throughout the project.

A further contract was awarded to Sparrows by DeepOcean to provide a Linear Cable Engine and operators on board the Edda Freya for the inter-array cable installations.

Ewen Kerr , chief technical officer, said: “We have experienced an upsurge in business from the renewable sector in the last 12 months and the combination of the three contracts won for Hornsea One, makes this our most significant cable lay project to date. One of the contracts marks the first time we have conducted nearshore cable transfer operations and this is a testament to our highly trained engineering teams who worked to develop the most effective solution for our client.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago