Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Selly Park Flood Prevention Scheme Complete
Dredging

March 12, 2019 · about 7 years ago

Selly Park Flood Prevention Scheme Complete

Both phases (North and South) of the £4 million Selly Park flood prevention scheme have been completed by Team Van Oord on behalf of the Environment Agency. The works have significantly reduced the risk of flooding from Bourn Brook, a tributary of the River Rea, for hundreds of local homes and busin

2 minutes read
  • LinkedIn
  • X
  • Email

Both phases (North and South) of the £4 million Selly Park flood prevention scheme have been completed by Team Van Oord on behalf of the Environment Agency.

The works have significantly reduced the risk of flooding from Bourn Brook, a tributary of the River Rea, for hundreds of local homes and businesses.

The works at one location – Harborne Lane – had the potential to significantly affect local residents through the removal of a sizable quantity of arisings from the earthworks.

However, to avoid this, the project team managed – after considerable negotiation – to arrange access to site through an unused plot directly onto the main road, thereby avoiding the residential street Arosa Drive.

Selly Park North

Under the Selly Park North scheme, which was ‘fast tracked’ by the Environment Agency, the existing ground level was raised at the three-acre site of the former BBC Sports and Social Club at Pebble Mill – an area which has previously been unusable in planning terms due to its flood status.

A flood relief overflow channel off Bourn Brook further reduced flows to and under the Pershore Road Bridge. From here, a new tunnel was constructed to form an underground flood relief culvert which allows a second flood water route to pass under Pershore Road to the River Rea, thereby completing the flood mitigation scheme.

Selly Park South

This £2.7 million Selly Park South flood defense scheme has reduced the risk to more than 200 residential and commercial properties in this part of Birmingham.

The scheme comprised the construction of an embankment and a pile cladded wall to prevent water from overtopping the River Rea and creation of an area to store water during storm events.

New reinforced concrete walls were constructed to protect the properties directly affected by the works, which commenced in September 2016 and was officially opened in January 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free