Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›PSA Probes Snorre Expansion Christmas Tree Fabrication
Business & Finance

March 18, 2019 · about 7 years ago

PSA Probes Snorre Expansion Christmas Tree Fabrication

Norway’s Petroleum Safety Authority (PSA) has carried out an audit of Equinor and the fabrication of the subsea Christmas tree for the Snorre expansion project. The objective of the audit was to ensure that fabrication of the subsea Christmas tree for the Snorre expansion project complied with the c

2 minutes read
  • LinkedIn
  • X
  • Email

Norway’s Petroleum Safety Authority (PSA) has carried out an audit of Equinor and the fabrication of the subsea Christmas tree for the Snorre expansion project.

The objective of the audit was to ensure that fabrication of the subsea Christmas tree for the Snorre expansion project complied with the company’s own requirements and requirements in the regulations. A sub-goal was to follow up how the project is undertaking its supervisory duty in respect of its supplier – TechnipFMC.

The audit, conducted in February this year did not identify any non-conformities, however, the PSA observed two areas with potential for improvement related to follow-up of suppliers and qualification of materials.

Snorre Expansion Project

In July, the Ministry of Petroleum and Energy approved the revised plan for development and operation (PDO) for further development of the Snorre field, called the Snorre Expansion Project (SEP).

The SEP is a major subsea development, and the largest improved recovery project on the Norwegian Shelf today. The project represents an investment that will contribute to 25 more years of production on Snorre.

The project comprises installation of six well templates with 24 wells that will be tied back to the Snorre A platform. The plan includes an option for further expansion with additional well templates. When production started on Snorre, the expected field life was up to 2011-2014. With the contribution from SEP, calculations show that the field can have profitable production all the way through 2040.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago