Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›NKT Completes Power from Shore Cable for Martin Linge
Equipment

March 20, 2019 · about 7 years ago

NKT Completes Power from Shore Cable for Martin Linge

NKT has completed the power from shore cable system for Equinor’s Martin Linge oil and gas field in Norway. The cable system solution from NKT plays a key part in making the field more carbon-efficient as is it powered from shore by the 163 kilometers long 145 kV high-voltage alternate current (HVAC

2 minutes read
  • LinkedIn
  • X
  • Email

NKT has completed the power from shore cable system for Equinor’s Martin Linge oil and gas field in Norway.

The cable system solution from NKT plays a key part in making the field more carbon-efficient as is it powered from shore by the 163 kilometers long 145 kV high-voltage alternate current (HVAC) power cable. The project has been executed on behalf of Subsea 7.

“We are happy to continue the good collaboration with Subsea 7 and Equinor and to be supporting their focus on driving sustainable offshore operations with our extensive experience in turnkey solutions for the oil and gas sector. It is a great achievement for NKT having installed the world’s longest HVAC submarine cable solution and we once again demonstrate that we have the inhouse expertise to design, develop and install solutions in very demanding and complex environments,” said Andreas Berthou , executive vice president and head of HV Solutions at NKT.

NKT has designed, engineered, manufactured and installed the cable order comprising the 145 kV three-core XLPE HVAC submarine cable including fiber optic links with a 55 MW capacity.

Furthermore, a 3,5 km long, 17,5 kV infield cable was installed – including 500 meters of dynamic cable.

The power from shore solution from NKT will help Equinor save 200,000 tonnes CO2 annually once the field is in operation as the activities of Martin Linge will be powered from the onshore power grid instead of onsite generators.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

ACUA's Pioneer USV in Plymouth Sound; Source: ACUA Ocean
Automation

UK’s testbed on the lookout for partners after spotlighting subsea range with multi-robot demo

about 1 month ago

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

ACUA's Pioneer USV in Plymouth Sound; Source: ACUA Ocean
Automation

UK’s testbed on the lookout for partners after spotlighting subsea range with multi-robot demo

about 1 month ago
Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago