Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Solar to Power Sand Bypass System on Gold Coast
Business & Finance

March 21, 2019 · about 7 years ago

Solar to Power Sand Bypass System on Gold Coast

A pilot solar-powered, renewable energy system will be used to help power the Gold Coast’s Seaway Sand Bypass System, reducing carbon emissions and driving down operational costs. Design work is underway on a 100-kilowatt solar photovoltaic array to be installed at the Sand Bypass System at The Spit

1 minutes read
  • LinkedIn
  • X
  • Email

A pilot solar-powered, renewable energy system will be used to help power the Gold Coast’s Seaway Sand Bypass System, reducing carbon emissions and driving down operational costs.

Design work is underway on a 100-kilowatt solar photovoltaic array to be installed at the Sand Bypass System at The Spit.

The Sand Bypass System transports 500,000 cubic meters of sand from The Spit to South Stradbroke Island each year, helping to keep the Gold Coast Seaway safe and navigable for recreational and commercial vessels.

The Gold Coast Waterways Authority (GCWA) has awarded the contract to design, install and maintain the pilot solar system to a local company, SAE Group.

Transport and Main Roads Minister Mark Bailey said that the project complemented the Palaszczuk Government commitment to renewable energy and reducing carbon emissions.

“ The Palaszczuk Government is committed to renewable energy and to its 50 per cent renewable energy target for 2030 ,” Mr Bailey said. “ The Sand Bypass System supports the sustainable operation of our waterways, but it requires a significant amount of energy to ensure the waterways remain accessible and safe.”

‘‘ This 100-kilowatt, solar-powered system will produce enough energy to meet the day-time needs of the Sand Bypass System, helping to reduce the annual electricity bill by $24,000, ” he added.

GCWA is investing $350,000 in the pilot project. Installation is expected to start in April and be finished by the end of June this year.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago