Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Maintenance Dredging of Intracoastal Waterway Underway
Dredging

March 22, 2019 · about 7 years ago

Maintenance Dredging of Intracoastal Waterway Underway

The U.S. Army Corps of Engineers, Jacksonville District announced today that the maintenance dredging of the Intracoastal Waterway (IWW) channel for Palm Beach and Broward counties is underway. Dredging in Palm Beach County is limited to a small shoal and will bring the channel down to a depth of 9

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Jacksonville District announced today that the maintenance dredging of the Intracoastal Waterway (IWW) channel for Palm Beach and Broward counties is underway.

Dredging in Palm Beach County is limited to a small shoal and will bring the channel down to a depth of 9 feet, plus one foot of allowable over-depth.

The second location, in Broward County, lies in the vicinity of the IWW and the Hillsboro Inlet channel.

According to the Corps, the two locations are approximately 16 miles apart.

Dredging in Broward will bring the required channel depth to 10 feet, plus two feet of allowable over-depth.

Approximately 27,000 cubic yards of excavated material will be dredged between these two areas and will be placed in Dredge Material Management area MSA641A which is located in Palm Beach County, immediately adjacent to the Palm Beach dredge area.

The $1.7 million maintenance dredging contract was awarded to Cavache, Inc. of Pompano Beach, Fla. on Feb. 20, 2019. The project is anticipated for completion by the end of August 2019.

Boaters navigating the IWW while dredging is underway should remain diligent and aware of work areas as barges will be moving between the dredge areas and MSA641A. The contractor will take all measures to minimize obstructions to navigation as much as possible, the Corps concluded.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free