Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Neptune Drafts Minke and Juliet Decom Plans
Business & Finance

March 28, 2019 · about 7 years ago

Neptune Drafts Minke and Juliet Decom Plans

Neptune Energy has filed its draft for decommissioning of two fields located in the Southern North Sea, the Minke and Juliet. The Minke field is located in the Southern Basin of the UKCS and lies about 184 km from the Norfolk coastline. Minke began production in 2007 and was developed through a sing

1 minutes read
  • LinkedIn
  • X
  • Email

Neptune Energy has filed its draft for decommissioning of two fields located in the Southern North Sea, the Minke and Juliet.

The Minke field is located in the Southern Basin of the UKCS and lies about 184 km from the Norfolk coastline. Minke began production in 2007 and was developed through a single subsea satellite well. The MInke field cessation of production (CoP) was granted in 2016 by OGA.

The Juliet field is located in the UK North Sea some 40 km due east from the Humberside estuary and approximately 9 km to the south of the Amethyst gas field. The field was discovered in 2008 and came into production in 2014 as a two-well subsea tieback development. The CoP for Juliet was submitted in July 2018.

According to Neptune, the Juliet manifold and wellhead protection structure will be fully recovered to shore for resuse/recycling.

The trenched and buried pipeline and umbilical will be decommissioned in situ on both fields.

Juliet surface laid sections of pipeline and umbilical such as tie in spools and control jumpers will be recovered to shore for reuse/recycling as well as the exposed mattresses and grout bags.

The Minke wellhead protection structure will be removed and recovered to shore for reuse/recycling.

Small surface laid sections of pipeline and all exposed mattresses and grout bags will be recovered to shore for reuse/recycling.

All wells will be plugged and abandoned.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago