Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Shell taps Subsea 7 for Arran field work worth over $100 million
Fossil Energy

March 29, 2019 · about 7 years ago

Shell taps Subsea 7 for Arran field work worth over $100 million

Shell has hired offshore installation and construction company Subsea 7 for work on the Arran gas field development in the UK North Sea.

2 minutes read
  • LinkedIn
  • X
  • Email

Shell has hired offshore installation and construction company Subsea 7 for work on the Arran gas condensate field development in the UK North Sea.

Subsea 7 will be responsible for the project management, engineering, procurement, construction and installation of 60 kilometers of mechanically lined pipe-in-pipe production flowline, together with subsea structures and tie-ins at the Arran and Columbus gas condensate fields and the Shearwater platform.

The Arran field sits around 240 kilometers east of Aberdeen and approximately 3 kilometers from the United Kingdom (UK)/Norway median line.

The contractor said on Friday that project management and detailed engineering had already started at Subsea 7’s office in Aberdeen. Offshore activities are expected to begin in 2020. This contract award is between $100 million and $200 million.

Jonathan Tame , Vice President UK & Canada, said: “This latest contract builds on our strong and established relationship with Shell, which has seen us deliver our design, engineering and technology expertise on a range of their projects for over 35 years.”

Shell took over operatorship of the Arran field in the UK North Sea and made the final investment decision (FID) to develop the field in October 2018.

At peak production, Arran is expected to produce around 100 million standard cubic feet a day of gas and 4,000 barrels per day of condensate, which combined equates to 21,000 barrels of oil equivalent per day (gross).

The natural gas and liquids will be transported via a subsea pipeline to the Shell-operated Shearwater platform.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free