Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›GE Haliade-X 12 MW Prototype Breaks Rotterdam Ground
Ports & Logistics

April 1, 2019 · about 7 years ago

GE Haliade-X 12 MW Prototype Breaks Rotterdam Ground

Future Wind has organized a ground-breaking event in Maasvlakte, Rotterdam, to mark the start of preparatory activities to host GE’s Haliade-X 12 MW wind turbine prototype. Earlier this year, GE Renewable Energy and Future Wind, a joint venture between Pondera Development and SIF Holding Netherlands

1 minutes read
  • LinkedIn
  • X
  • Email

Future Wind has organized a ground-breaking event in Maasvlakte, Rotterdam, to mark the start of preparatory activities to host GE’s Haliade-X 12 MW wind turbine prototype.

Earlier this year, GE Renewable Energy and Future Wind, a joint venture between Pondera Development and SIF Holding Netherlands, signed an agreement to install the first Haliade-X 12 MW wind turbine prototype in Maasvlakte-Rotterdam this summer. The deal includes five years of testing and a 15-year full-service Operations and Maintenance agreement.

The first activities on the ground started earlier this year with the construction of the Haliade-X 12MW foundation. The foundation will contain 50 piles that will be covered by a 28-meter long foundation plate, Future Wind said.

Activities to prepare the foundation will continue until the arrival of Haliade-X 12 MW nacelle, blades and tower prototype parts later in the summer.

The prototype will be installed onshore to facilitate access for testing. During the initial period of operations, it will allow GE Renewable Energy to collect data needed to obtain the Type Certificate in 2020 and ship the first commercial units in 2021.

The Haliade-X 12 MW is currently being assembled at GE’s factory in Saint-Nazaire, France, while its three LM Wind Power-designed 107-metre blades are being manufactured in Cherbourg, France, and tower sections produced in Seville, Spain. All components will be shipped to Rotterdam, where pre-assembly work and installation will take place.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & LogisticsResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

15 days ago

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

15 days ago
Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

16 days ago