Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Jan De Nul Completes Cable Scope for ADNOC’s NASR Field
Equipment

April 2, 2019 · about 7 years ago

Jan De Nul Completes Cable Scope for ADNOC’s NASR Field

Jan De Nul Group has completed the cable installation scope for the Phase II of NASR Full Field Development, located approximately 130km northwest of Abu Dhabi. Jan De Nul was subcontracted by Hyundai Heavy Industries for the cable loading, transport, laying and protection of three 132kV subsea powe

1 minutes read
  • LinkedIn
  • X
  • Email

Jan De Nul Group has completed the cable installation scope for the Phase II of NASR Full Field Development, located approximately 130km northwest of Abu Dhabi.

Jan De Nul was subcontracted by Hyundai Heavy Industries for the cable loading, transport, laying and protection of three 132kV subsea power cables (total length 147km) and ten 11kV subsea power cables (total length 57km).

The NASR oil field project is part of the ADNOC strategic development programme to increase the field’s capacity to 65,000 barrels per day.

A total of 204km of cable was loaded in Norway, and transported and installed at the project site in two separate trips with the Cable Laying Vessel ‘Isaac Newton’.

Furthermore, the Multi-Purpose Vessel ‘Daniel Bernoulli’ executed the full cable protection scope including 53km of post-lay trenching, the installation of 671 concrete mattresses as well as 8km of rock berm installation.

In addition, a rock berm protection for subsea cable was designed and incorporated for the first time in the ADNOC offshore fields, Jan De Nul noted.

Wouter Vermeersch , manager Offshore Cables at Jan De Nul: “We are very proud to have been part of the ADNOC Development Project. The versatility of our fleet and operational capabilities have been instrumental in the successful completion of this challenging scope of work.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

ACUA's Pioneer USV in Plymouth Sound; Source: ACUA Ocean
Automation

UK’s testbed on the lookout for partners after spotlighting subsea range with multi-robot demo

about 1 month ago

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

ACUA's Pioneer USV in Plymouth Sound; Source: ACUA Ocean
Automation

UK’s testbed on the lookout for partners after spotlighting subsea range with multi-robot demo

about 1 month ago
Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago