Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›USACE Meeting on Turpentine Run Project
Dredging

April 2, 2019 · about 7 years ago

USACE Meeting on Turpentine Run Project

The U.S. Army Corps of Engineers, Jacksonville District, will host a public meeting for the Turpentine Run project in St. Thomas, U.S. Virgin Islands. The meeting will be held at Bertha C. Boschulte Middle School Auditorium at 9-1-12A Bovoni in St. Thomas, VI 00802, Wednesday, April 3, 2019 from 5 t

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Jacksonville District, will host a public meeting for the Turpentine Run project in St. Thomas, U.S. Virgin Islands.

The meeting will be held at Bertha C. Boschulte Middle School Auditorium at 9-1-12A Bovoni in St. Thomas, VI 00802, Wednesday, April 3, 2019 from 5 to 7 p.m.

Commissioner Nelson Petty Jr. with the U.S. Virgin Islands Department Public Works, the project’s non-federal sponsor, will be in attendance.

The purpose of the public meeting is to present and discuss the Turpentine Run project. The purpose of the project, authorized under Section 205 of the Flood Risk Reduction Continuing Authorities Program, is to reduce flood damage to the Nadir development along Turpentine Run.

A previous study conducted by the Corps determined a recommended plan which included the construction of a 460-foot long concrete “U” shape channel, a drop structure and 170-foot long sheet pile wall along the developed side of the channel, a 260-foot levee along the northern edge of Nadir, a 1,300-foot long levee starting south of the new Bovoni Road Bridge and ending at the Nadir racetrack and Interior drainage conveyance from the existing small concrete channel.

USACE received additional funding under the Bipartisan Budget Act of 2018 to complete an addendum to the previous study confirming the engineering, environmental and economic aspects of the project.

According to the Corps, this study will benefit from public involvement and encourages participation in the National Environmental Policy Act process.

The deadline for sending comments on the proposed works is April 20, 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free