Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Xodus Completes Project for North Sea Operator
Operations & Maintenance

April 2, 2019 · about 7 years ago

Xodus Completes Project for North Sea Operator

Xodus Group has carried out a concept study and Front End Engineering Design (FEED) project for a North Sea operator and determined that the operator will save up to £59 million by adopting a Not Normally Attended (NNA) status ahead of decommissioning the field. The North Sea field recently complete

2 minutes read
  • LinkedIn
  • X
  • Email

Xodus Group has carried out a concept study and Front End Engineering Design (FEED) project for a North Sea operator and determined that the operator will save up to £59 million by adopting a Not Normally Attended (NNA) status ahead of decommissioning the field.

The North Sea field recently completed well plugging & abandonment (P&A) programmes for two platforms. A third platform is not due to start for at least two years and although it operated as a manned facility, it ceased production several years ago.

The operator required support to convert the platform to a minimum facilities asset which would significantly reduce abandonment support costs over a six-year period until the final decommissioning programme begins.

Following a competitive tender process, Xodus initiated a concept study in October 2017 which was closely followed by a FEED project in December 2017. The transition of the platform to NNA status has now been completed, the company informed.

Babak Alnasser , Xodus’ technical safety & risk manager and project manager for the work, said: “The objective of the project was to look at the technical and economic feasibility of taking the manned platform with all the associated maintenance, inspection, operation and cost that goes along with it, and move it to a minimum facilities asset.

“With it being the first asset in the operator’s portfolio that is transitioning to NNA mode, there was always going to be significant learning. However, the close collaborative working relationship between the companies and the coordination between our multi-discipline teams led to the successful delivery of the project.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago

FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago
FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago