Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Wärtsilä equipment picked for Knutsen’s LNG vessel
Equipment

April 8, 2019 · about 7 years ago

Wärtsilä equipment picked for Knutsen’s LNG vessel

Finnish technology group Wärtsilä will supply an equipment package for a 30,000 cbm LNG vessel under construction in South Korea.

2 minutes read
  • LinkedIn
  • X
  • Email

Finnish technology group Wärtsilä will supply an equipment package for a 30,000 cbm LNG vessel under construction in South Korea.

Wärtsilä said on Monday that it would deliver integrated propulsion and cargo handling solution for an LNG vessel being built at the Hyundai Mipo Dockyard (HMD) on behalf of Norway-based Knutsen OAS Shipping.

The order with Wärtsilä was booked in January 2019, and the contract includes an option for an additional sister vessel.

The Wärtsilä equipment is scheduled for delivery in 2020, and the vessel is expected to be delivered during the first half of 2021.

Under a 12-year long term charter, the vessel will be operated by Knutsen and chartered to Italian energy services provider Edison. It will be used to supply coastal LNG deposit terminals in Italy.

As for the cargo handling system, it would include the fuel supply, cargo control system, boil-off gas (BOG) reliquefaction, and safety management.

The five-cylinder dual-fuel main engine and the Wärtsilä auxiliary dual-fuel engines are essential consumers for the BOG management system, which monitors and controls the cryogenic cargo, to ensure, in combination with a developed mixed refrigerant re-liquefaction unit, all-time control over the cargo tank pressure and temperature.

The company added that the vessel would be one of the first LNG carriers in its size to be equipped with space-saving C-type bi-lobe cargo tanks.

Within the equipment package, the company will deliver three dual-fuel auxiliary engines that power the board net, thrusters, cargo control system, and re-liquefaction module.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

26 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

26 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

26 days ago