Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Preparation Works Underway for Broughty Ferry Scheme
Dredging

April 9, 2019 · about 7 years ago

Preparation Works Underway for Broughty Ferry Scheme

Dundee City Council said in its latest announcement that the preparation works for the Broughty Ferry Flood Protection Scheme started this week. Contractor BAM Ritchies will be at various points between Douglas Terrace and Beach Crescent between 8am and 5pm for four weeks, said the council. Investig

1 minutes read
  • LinkedIn
  • X
  • Email

Dundee City Council said in its latest announcement that the preparation works for the Broughty Ferry Flood Protection Scheme started this week.

Contractor BAM Ritchies will be at various points between Douglas Terrace and Beach Crescent between 8am and 5pm for four weeks, said the council.

Investigations operations, which officially started yesterday, will consist of exploratory investigations to determine ground conditions and ground water levels.

The results arising from the investigations will inform the structural design and construction method of the final flood prevention scheme.

It is expected that 80% of the funds required will be supplied by the Scottish Government Capital Grant for Flood Schemes. The remaining 20% funding has been included within the Dundee City Council Capital Plan 2016-2021.

Background

During early 2016, the council sought the views of the communities affected on the preferred option which is a set-back wall solution which will comprise of a one meter high wall to the rear (roadside) of the footway.

Enhancements to the footway will be carried out alongside the wall works.

According to the council, the wall will include openings to allow for public access with gates that can be drawn over should a risk of flooding occur.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free