Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›TAP Advances Pipelay Ops Off Albania
Business & Finance

April 9, 2019 · about 7 years ago

TAP Advances Pipelay Ops Off Albania

Trans Adriatic Pipeline (TAP)’s first ever offshore pipelines in Albania were recently pulled ashore. For this operation, TAP’s engineering, procurement, construction and installation (EPCI) contractor for the offshore section of the project, Saipem, used its pipelay barge Castoro 10. Steel pipes we

1 minutes read
  • LinkedIn
  • X
  • Email

Trans Adriatic Pipeline (TAP)’s first ever offshore pipelines in Albania were recently pulled ashore.

For this operation, TAP’s engineering, procurement, construction and installation (EPCI) contractor for the offshore section of the project, Saipem, used its pipelay barge Castoro 10.

Steel pipes were welded together on board the vessel, which was located 1.4 kilometers from the beach. The welds were then tested and the pipeline was lowered onto the seabed. The first 1.8 kilometers of welded pipe was pulled ashore at the landfall near Fier.

Saipem’s 139-meter long and 36-meter wide Castoro 10 pipelay barge now continues to lay pipes in Albanian shallow waters, to be followed by fibre-optic cable installation and backfilling offshore and at the landfall.

TAP marked the start of construction works for the offshore pipeline section in October 2018.

TAP’s offshore section, linking the Albanian and the Italian coasts, is 105 kilometers long.

The pipes will be laid on the Adriatic seabed – 37 kilometers in Albanian territorial waters, 25 kilometers in Italian territorial waters and 43 kilometers in international waters.

The deepest point of the pipeline will be more than 810 meters beneath sea level. Approximately 9,000 pipes, with a 36-inch diameter, will be used, weighing approximately 100,000 tonnes in total.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago