Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Windhoist Assembles Final Beatrice Tower
Ports & Logistics

April 10, 2019 · about 7 years ago

Windhoist Assembles Final Beatrice Tower

Windhoist Limited has pre-assembled the 84th and final wind turbine tower on the Beatrice Pre-Assembly Project at Nigg Energy Park in Scotland. Siemens Gamesa awarded Windhoist with a contract to carry out wind turbine pre-assembly work for the 588MW Beatrice wind farm in May 2018, marking the Scott

1 minutes read
  • LinkedIn
  • X
  • Email

Windhoist Limited has pre-assembled the 84th and final wind turbine tower on the Beatrice Pre-Assembly Project at Nigg Energy Park in Scotland.

Siemens Gamesa awarded Windhoist with a contract to carry out wind turbine pre-assembly work for the 588MW Beatrice wind farm in May 2018, marking the Scottish company’s first foray into offshore wind.

Under the contract, Windhoist is providing onshore pre-construction support for 84 Siemens 7MW turbines being installed at the wind farm in the Scottish Moray Firth.

Swire Blue Ocean’s jack-up is loading the turbines in sets of five at the Nigg port, Siemens Gamesa’s pre-assembly base, and installing them at the site 13 kilometres off the Caithness coast. The wind turbines are being commissioned shortly after the installation.

Beatrice wind farm is owned and developed by Beatrice Offshore Windfarm Limited (BOWL), a joint venture partnership between SSE (40%), Copenhagen Infrastructure Partners (35%) and Red Rock Power Limited (25%).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

15 days ago

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

17 days ago

Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

15 days ago
Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

17 days ago
Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago