Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Photo of the Day: Maasvlakte Getting Ready for Haliade-X 12MW
Ports & Logistics

April 12, 2019 · about 7 years ago

Photo of the Day: Maasvlakte Getting Ready for Haliade-X 12MW

GE Renewable Energy is currently preparing the site in Maasvlakte, the Netherlands, for installation of its Haliade-X 12MW wind turbine prototype. Preparations of the site which will host the world’s most powerful offshore wind turbine are being carried out in partnership with Future Wind. The two c

1 minutes read
  • LinkedIn
  • X
  • Email

GE Renewable Energy is currently preparing the site in Maasvlakte, the Netherlands, for installation of its Haliade-X 12MW wind turbine prototype.

Preparations of the site which will host the world’s most powerful offshore wind turbine are being carried out in partnership with Future Wind.

The two companies signed an agreement at the beginning of the year under which the first Haliade-X 12 MW wind turbine prototype is to be installed in Maasvlakte-Rotterdam this summer, with five years of testing and a 15-year full-service O&M agreement.

The prototype, set to be installed onshore to facilitate access for testing, will allow the collection of data during the initial period of operations which is needed to obtain the Type Certificate in 2020 and ship the first commercial units in 2021.

Haliade-X 12 MW is currently being assembled at GE’s factory in Saint-Nazaire, France, with three LM Wind Power-designed 107m blades being manufactured in Cherbourg, France, and tower sections in Seville, Spain.

First activities on the ground started earlier this year with the construction of the Haliade-X 12MW foundation, which will contain 50 piles that will be covered by a 28m long foundation plate.

Foundation preparation will continue until the arrival of the nacelle, blades and tower prototype parts later in the summer.

All components will be shipped to Rotterdam, where pre-assembly work and installation will take place.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

17 days ago

Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

17 days ago
Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago