Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Vessels›Petronas to perform gassing up and cooling down at Pengerang LNG
Vessels

April 25, 2019 · about 7 years ago

Petronas to perform gassing up and cooling down at Pengerang LNG

Malaysian energy giant Petronas’ unit, Petronas LNG, formed a partnership with Pengerang LNG to provide gassing up and cooling down (GUCD) services at the Pengerang LNG terminal.

2 minutes read
  • LinkedIn
  • X
  • Email

Malaysian energy giant Petronas’ unit, Petronas LNG, formed a partnership with Pengerang LNG to provide gassing up and cooling down (GUCD) services at the Pengerang LNG terminal.

The terminal is owned by Pengerang LNG (Two), which is a joint venture between Petronas Gas, Dialog LNG and Permodalan Darul Ta’zim.

The recent completion of the GUCD for Petronas’ vessel Puteri Zamrud Satu marks a significant milestone for gassing up and cooling services at the facility. The GUCD took place after Puteri Zamrud Satu’s departure from the Malaysia Marine and Heavy Engineering (MMHE) dry dock in Pasir Gudang, Johor.

This GUCD operation signifies the first of many potential use of the services at the facility by other LNG vessel operators and owners due to its location along the Straits of Johor.

GUCD is a specialized service to displace the inert gas from the LNG vessel’s storage tanks and it is cooled down to cryogenic temperature (minus 160 degrees Celsius). This process is required for LNG vessels, typically post dry dock, before the vessel’s next LNG cargo loading.

Petronas LNG also signed a Marine Services Agreement with Johor Port Berhad (JPB) for the provision of marine services. The collaborative effort with JPB and Johor Port Authority (JPA) will encourage more vessel operators and owners to utilize the services at terminal due to its close proximity to shipyards in Malaysia and Singapore.

Pengerang LNG is Malaysia’s second LNG regasification terminal after regasification terminal Sungai Udang (RGTSU), built primarily to serve the refinery and petrochemical customers at the Pengerang Integrated Complex (PIC).

The facility features two LNG storage tanks with a total capacity of 400,000 cubic meters.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free