Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Sif Bolts Into Action for DEME
Offshore Wind

May 23, 2019 · about 7 years ago

Sif Bolts Into Action for DEME

Dutch offshore foundations manufacturer Sif has expanded its offering of services to cover bolting tests. Sif added the offering after a request from DEME Group to arrange all preparations for the test as part of the work scope for the Belgian SeaMade offshore wind project. During this test, the bol

2 minutes read
  • LinkedIn
  • X
  • Email

Dutch offshore foundations manufacturer Sif has expanded its offering of services to cover bolting tests.

Sif added the offering after a request from DEME Group to arrange all preparations for the test as part of the work scope for the Belgian SeaMade offshore wind project.

During this test, the bolted flange connection between a monopile and a transition piece (TP) is checked by fitting and torquing all 128 bolts.

Sif prepared the engineering and arranged a monopile section and a TP section to be manufactured with all the required lifting points. These sections were tilted straight up in Roermond and then transported to the Sif Maasvlakte 2 area. Using SPMTs, these sections were transported from the inner harbour to the quayside. With a 1300T crawler crane, the MP was lifted onto the foundation followed by the TP section on top.

After four days of testing by the client, the monopile and the TP were disassembled and returned to Roermond, where they will return into the normal production process, Sif said.

In December 2018, Dredging International, part of DEME Group, contracted Sif to produce the monopiles and, in a joint venture with Smulders, the transition pieces for the SeaMade offshore wind farm.

Sif will produce 58 monopiles and the primary steel for the transition pieces, with Smulders in charge of manufacturing the secondary steel and outfitting of the transition pieces.

The 487MW SeaMade, which includes the merged 235MW Mermaid and 252MW Seastar projects, will feature 58 Siemens Gamesa 8.0-167 DD turbines.

The construction is expected to begin in the summer of 2019 and the commissioning is scheduled before the end of 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindPorts & Logistics

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free