Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›Formosa Inter-Array Cable Installation Impending
Storage

May 29, 2019 · about 7 years ago

Formosa Inter-Array Cable Installation Impending

The installation of inter-array cables at the Formosa 1 Phase 2 offshore wind farm in Taiwan is scheduled to begin in June. Jan De Nul’s cable laying vessel Willem de Vlamingh will carry out the installation of 20 cables at the project site from 1 June to 30 September. The Luxembourg-based company i

1 minutes read
  • LinkedIn
  • X
  • Email

The installation of inter-array cables at the Formosa 1 Phase 2 offshore wind farm in Taiwan is scheduled to begin in June.

Jan De Nul’s cable laying vessel Willem de Vlamingh will carry out the installation of 20 cables at the project site from 1 June to 30 September.

The Luxembourg-based company is in charge of the design, procurement and installation of the turbine foundations, scour protection and cable installation on the project.

JDR Cable Systems is manufacturing and supplying 21 km of inter-array cables, as well as 13km of export and 16km of land cables for the wind farm.

Formosa 1, Taiwan’s first commercial-scale offshore wind farm, is being developed by Formosa I Wind Power, a partnership of Ørsted, JERA, Macquarie Capital, and Swancor Renewable Energy.

This next phase of the project has recently entered the construction phase and will add 20 Siemens Gamesa 6MW turbines to the already operational first phase.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago