Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Hess charters Maersk Drilling jack-up for Danish North Sea well
Fossil Energy

May 31, 2019 · about 7 years ago

Hess charters Maersk Drilling jack-up for Danish North Sea well

Danish offshore driller Maersk Drilling has secured a contract with Hess for its 2008-built jack-up rig Maersk Resilient.

2 minutes read
  • LinkedIn
  • X
  • Email

Danish offshore driller Maersk Drilling has secured a contract with Hess for its 2008-built jack-up rig Maersk Resilient.

The driller, which shared the news via social media on Friday, said Hess would use the rig to drill its Jill prospect in the Danish sector of the North Sea.

Maersk Drilling said the contract was expected to begin in September this year. The duration of the contract is 35 days.

The Maersk Resilient was the first in a series of four identical high-efficiency jack-ups. The rig, of an MSC CJ50-X100 MC design, was built by Keppel FELS in 2008.

It is equipped for high pressure/high-temperature drilling and is designed for year-round operation in the North Sea, in water depths up to 107 meters (350 ft) with an available leg length below the hull of 148 meters (485 ft). The rig can accommodate 120 people.

The Maersk Resilient is currently employed in the UK North Sea with Ithaca Energy which on Thursday agreed to buy Chevron’s North Sea fields for $2B .

The rig’s contract with Ithaca is set to expire in June, after which the Maersk Resilient is expected to be deployed at IOG’s Harvey location, also in the UK North Sea. IOG earlier this month said the spud date at Harvey would be in July.

Offshore Energy Today Staff

Spotted a typo? Have something more to add to the story? Maybe a nice photo? Contact our editorial team via email .

Offshore Energy Today, established in 2010, is read by over 10,000 industry professionals daily. We had nearly 9 million page views in 2018, with 2.4 million new users. This makes us one of the world’s most attractive online platforms in the space of offshore oil and gas and allows our partners to get maximum exposure for their online campaigns.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free