Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›JDR Inter-Array Cables for Largest Wind Farm Project Off Belgium
Business & Finance

June 5, 2019 · about 7 years ago

JDR Inter-Array Cables for Largest Wind Farm Project Off Belgium

JDR Cables, part of the TFKable, has signed a contract with DEME Offshore for the SeaMade offshore wind farm. JDR will design, manufacture and deliver 78.1 kilometres of aluminium core inter-array cables and a range of cable accessories, including repair joints and connectors. The inter-array cables

1 minutes read
  • LinkedIn
  • X
  • Email

JDR Cables, part of the TFKable, has signed a contract with DEME Offshore for the SeaMade offshore wind farm.

JDR will design, manufacture and deliver 78.1 kilometres of aluminium core inter-array cables and a range of cable accessories, including repair joints and connectors.

The inter-array cables connecting the 58 Siemens 8.4MW turbines, will carry clean generated electricity to an offshore substation for transmission to the offshore grid. The offshore wind power generated is transmitted by a 33kV cable system with hang-offs and connector terminations for 128 cable ends.

The cable will be assembled in JDR’s Hartlepool facility, with delivery expected by the end of 2019.

The SeaMade offshore wind farm is located up to 50 kilometres off the coast from Ostend and will integrate two wind sites known as Mermaid and Seastar.

The 487MW project is the single largest wind farm being funded and built in Belgium. When fully operational, the wind farm will supply renewable energy to 485,000 houses in Belgium and offset 700,000t of CO2 emissions a year.

The project, operated by SeaMade, which is a consortium of Otary RS (70% stake), Electrabel (17.5%), and Eneco Wind Belgium (12.5%) is expected to be operational by 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago