Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›NordLink Power Cable Reaches Germany
Offshore Wind

June 19, 2019 · about 7 years ago

NordLink Power Cable Reaches Germany

The power cable of the NordLink high voltage direct current (HVDC) subsea interconnector has been pulled in on the German coast, according to NKT. NKT is in charge of designing, manufacturing and installing more than 400km of the 525kV mass impregnated cable system in the German part of the project

1 minutes read
  • LinkedIn
  • X
  • Email

The power cable of the NordLink high voltage direct current (HVDC) subsea interconnector has been pulled in on the German coast, according to NKT.

NKT is in charge of designing, manufacturing and installing more than 400km of the 525kV mass impregnated cable system in the German part of the project connecting Norway and Germany.

“The impressive NordLink power cable has now been pulled in on the Germany coast marking a key milestone in the project connecting the power grids of Norway and Germany,” NKT reported.

Nexans is responsible for the design, production and installation of six 525kV mass impregnated HVDC interconnector cables for the Norwegian part of the project.

NordLink is 623km long and will directly connect the energy markets of Germany and Norway for the first time and serve as an exchange between German wind energy and Norwegian hydropower.

The 1,400MW interconnector is a joint project of the Norwegian Statnett and Germany’s DC Nordseekabel GmbH, a joint venture between TenneT and KfW.

Installation began in August 2017 with the first meters of cable laid on the seabed in Vollesfjord in Vest-Agder, Norway. Commissioning is expected this year, with commercial operation the year after.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free