Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›More Time to Comment on Chicago Area Waterway System DMMP
Dredging

June 20, 2019 · about 7 years ago

More Time to Comment on Chicago Area Waterway System DMMP

The U.S. Army Corps of Engineers, Chicago District, is extending the public comment period once again for the draft Chicago Area Waterway System (CAWS) Dredged Material Management Plan (DMMP) and integrated Environmental Impact Statement. The original 45-day comment period was scheduled to run from

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Chicago District, is extending the public comment period once again for the draft Chicago Area Waterway System (CAWS) Dredged Material Management Plan (DMMP) and integrated Environmental Impact Statement.

The original 45-day comment period was scheduled to run from May 3, 2019, through June 17, 2019.

It was then extended to July 2, 2019, based on requests received from project stakeholders and the public during three meetings that the Chicago District hosted in May 2019.

Now, the public comment period is being extended one more time as a result of ongoing coordination with study stakeholders in order to ensure that they are better able to review and comment on the study, reported the Corps.

The public review period will now officially close on Aug. 1, 2019.

The purpose of the study is to identify and evaluate alternatives for dredged material management for the CAWS, which is made up of six federal navigation projects: Calumet Harbor and River; the Calumet-Saganashkee (Cal-Sag) Channel; Chicago Harbor; Chicago River; the South Branch of the Chicago River; and the Chicago Sanitary and Ship Canal.

USACE also added that they have analyzed alternatives that could safely confine 20 years’ worth of dredged material generated in the operation and maintenance of the federal navigation channels of the CAWS.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free