Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›ABPmer Wins Arklow Bank – Phase 2 Work
Subsea

June 21, 2019 · about 7 years ago

ABPmer Wins Arklow Bank – Phase 2 Work

ABPmer is supporting SSE Renewables in the development of Phase 2 of its Arklow Bank Wind Park project, off the east coast of Ireland. ABPmer has been commissioned to prepare a preliminary site condition report and manage the associated metocean survey which will then be used in conjunction with new

2 minutes read
  • LinkedIn
  • X
  • Email

ABPmer is supporting SSE Renewables in the development of Phase 2 of its Arklow Bank Wind Park project, off the east coast of Ireland.

ABPmer has been commissioned to prepare a preliminary site condition report and manage the associated metocean survey which will then be used in conjunction with new numerical modelling to refine the preliminary results and inform a final site condition peport.

David Lambkin , ABPmer project manager, said: “ We are delighted to be preparing the site condition reports for the Arklow Bank Wind Park development on behalf of SSE Renewables. We regularly undertake metocean and morphological analysis for offshore windfarms but the mixture of relatively shallow water, stronger tidal currents and exposed wave climate make this a particularly interesting location to study.

“Our validated hindcast databases – SEASTATES – are the starting point for any metocean studies or parameters we provide and have been used to inform the preliminary report. As we move forward, this will be supplemented and validated with new data from a metocean survey and new high-resolution, site specific numerical modelling .”

The site condition reports provide SSE Renewables with a wide range of metocean statistics, as well as a description of the seabed morphology, sediment transport patterns and a high-level assessment of scour potential. This will provide a basis for engineering design and operational planning, which will be further refined and validated from the early planning stages through to final design.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentProject & TendersResearch & DevelopmentEvents

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free