Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›GTT pens tank design order for five LNG-fuelled vessels
Project & Tenders

June 27, 2019 · about 7 years ago

GTT pens tank design order for five LNG-fuelled vessels

French liquefied natural gas containment system specialist, GTT has been contracted by Chinese Jiangnan Shipyard to design tanks for five new LNG-fuelled container ships.

1 minutes read
  • LinkedIn
  • X
  • Email

French liquefied natural gas containment system specialist, GTT has been contracted by Chinese Jiangnan Shipyard to design tanks for five new LNG-fuelled container ships.

GTT said on Wednesday that the vessels had a capacity of 15,000 TEU and would be built on behalf of a European ship-owner.

The company added that the LNG fuel tanks would be capable of holding 14,000 cubic meters of LNG per ship. GTT’s Mark III Flex membrane containment system was chosen for its space optimization allowing maximum usage of cargo capacity.

According to GTT, the delivery of the vessels is scheduled to happen between the second half of 2021 and the first half of 2022.

Philippe Berterottière , chairman and CEO of GTT, said: “ Less than 18 months after the first order for LNG-fuelled container ships, we are delighted to confirm, with this new order, the interest and effectiveness of our solutions to address the emerging environmental challenges for shipping. “

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free