Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Quai de Flandres Extension Inaugurated
Dredging

June 27, 2019 · about 7 years ago

Quai de Flandres Extension Inaugurated

The extension of the Dunkerque Port’s Quai de Flandres was officially inaugurated on June 20 in the presence of Patrice Vergriete, Mayor of Dunkerque, Christine Cabau-Woehrel, Executive Vice-President in charge of assets for the CMA CGM Group, Stephane Raison, President of the Executive Board of Dun

1 minutes read
  • LinkedIn
  • X
  • Email

The extension of the Dunkerque Port’s Quai de Flandres was officially inaugurated on June 20 in the presence of Patrice Vergriete, Mayor of Dunkerque, Christine Cabau-Woehrel, Executive Vice-President in charge of assets for the CMA CGM Group, Stephane Raison, President of the Executive Board of Dunkerque-Port, and other officials.

The length of the Quai de Flandres is now 1.785m, of which nearly 1,000m have been dredged to -17,30m depth, making it possible to simultaneously berth two Ultra Large Container Ships (ULCS) 400m long in all tidal conditions.

According to an official announcement, berthing conditions at the ship terminal have also been improved by replacing all the marine fenders and reinforcing the mooring bollards.

“The layout and installation work included earthworks of nearly 650.000m³ of spoil, the use of 10.000 tons of steel and 15.000 cubic meters of concrete, the dredging of several million m³ of sand and the covering of 3.5 hectares of quayage,” said the port.

During the project, several compensatory measures, consisting of wetlands, mosaics of environments and dunes, have also been recreated on some 35 hectares of land belonging to the Port of Dunkerque.

The new wharf and its facilities were handed over to Terminal des Flandres, operator of the container terminal.

All the extension work on the Quai de Flandre was carried out under Dunkerque-Port Project Management and was co-financed by the State.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free