Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Weston Solutions Wins L575a Deal
Dredging

July 12, 2019 · about 7 years ago

Weston Solutions Wins L575a Deal

The U.S. Army Corps of Engineers, Omaha District, awarded a $2.7 million contract Wednesday to build up the elevation on previously closed breach L575a near Percival Iowa, and on breach 575b near Hamburg, Iowa, expected to be closed in the next few days. USACE awarded the contract to Weston Solution

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Omaha District, awarded a $2.7 million contract Wednesday to build up the elevation on previously closed breach L575a near Percival Iowa, and on breach 575b near Hamburg, Iowa, expected to be closed in the next few days.

USACE awarded the contract to Weston Solutions, Inc. of West Chester PA. The breach closure will ensure that a minimum level of protection is provided during repairs of critical infrastructure behind the levee.

The initial breach closures are scheduled for completion within 45 calendar days of the contract award, said USACE.

“These repairs are the second stage of repairs at two breach locations,” said Patricia Lambert, Deputy Chief, System Restoration Team.

“One of the initial breaches was closed on June 20th. The second breach is targeted to be closed by the end of this weekend. This new contract will build on those initial breach closure pads to bring the levee elevations at those breaches up another two feet to 4.5 feet. Final designs for this levee system are in the engineering and design phase in order to eventually restore the levee to its authorized level.”

The objective of the repair work is to increase the level of flood risk management to approximately the 4% Annual Chance Exceedance (25‐yr) level for this section of the L575 Levee System until the system can be fully rehabilitated.

This scope of work also includes interim repairs, said USACE.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free