Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›WindFloat Atlantic Enters Turbine Assembly Mode
Wind Farms

July 17, 2019 · about 7 years ago

WindFloat Atlantic Enters Turbine Assembly Mode

The installation of the first WindFloat Atlantic turbine on its floating platform will begin on Wednesday, 17 July in the outer harbor of Ferrol, Spain. The fabrication and load-out of this first WindFloat platform, developed by Principle Power, was completed last week in Fene, and the platform has

1 minutes read
  • LinkedIn
  • X
  • Email

The installation of the first WindFloat Atlantic turbine on its floating platform will begin on Wednesday, 17 July in the outer harbor of Ferrol, Spain.

The fabrication and load-out of this first WindFloat platform, developed by Principle Power, was completed last week in Fene, and the platform has been moored to the quayside in Ferrol, where the installation of the MHI Vestas 8.4MW wind turbine, the largest ever to be installed on a floating foundation, will begin.

The assembly will take place over the coming weeks in preparation for the offshore operations, scheduled for the end of summer, when the floating structure will depart for its final destination off the coast of Viana do Castelo, Portugal.

The WindFloat Atlantic project is being realized by the Windplus consortium, which is jointly owned by EDP Renováveis (54.4%), ENGIE (25%), Repsol (19.4%) and Principle Power Inc. (1.2%).

The three turbines that comprise the wind farm will be mounted on floating platforms anchored to the seabed, and will collectively deliver an installed capacity of 25MW. The wind farm will be located 20 kilometers off the coast of Viana do Castelo, where the water depth reaches 100 meters.

Some of the suppliers involved in the project are Principle Power, Navantia/Windar Joint Venture, A. Silva Matos Group, Bourbon, along with turbine supplier MHI Vestas, and dynamic cable supplier JDR Cables.

Photos: Repsol

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsPorts & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free