Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›NOPSEMA Opens for Comment 3D Oil’s Plan for Seismic Survey
Operations & Maintenance

July 23, 2019 · about 7 years ago

NOPSEMA Opens for Comment 3D Oil’s Plan for Seismic Survey

Australia’s NOPSEMA has opened for public comment the environment plan for 3D Oil Limited’s Sauropod 3D marine seismic survey in the Roebuck Basin, within exploration permit WA-527-P. 3D Oil proposed on July 16th to undertake the Sauropod 3D marine seismic survey in Commonwealth waters of the Roebuc

2 minutes read
  • LinkedIn
  • X
  • Email

Australia’s NOPSEMA has opened for public comment the environment plan for 3D Oil Limited’s Sauropod 3D marine seismic survey in the Roebuck Basin, within exploration permit WA-527-P.

3D Oil proposed on July 16th to undertake the Sauropod 3D marine seismic survey in Commonwealth waters of the Roebuck Basin, within exploration permit WA-527-P. The purpose of the Sauropod 3D survey is to collect high quality geophysical data about rock formations and structures beneath the seabed and assess potential for new oil and gas discoveries.

The acquisition area covers approximately 3,500 km2. The acquisition area is surrounded by a larger operational area (approximately 6,000 km2), for the purpose of line turns, run-ins, run-outs, seismic testing and support activities. The seismic survey will be undertaken in water depths between approximately 95 m to 172 m.

The survey will involve a single seismic survey vessel towing a seismic source array with a total volume of 3,090 cubic inches (in3), at a water depth of approximately 5 – 10 m.

The seismic source will use compressed air to emit regular pulses of sound that reflect off the seabed and underlying rock formations. The reflected sound wave will be received by up to 12 hydrophone streamers. Each streamer will be up to 7,000 m in length, spaced 75 m apart and towed at a depth of approximately 15 m.

The Sauropod 3D survey will take a maximum of 60 days to acquire, and will be undertaken within the acquisition window of January to April 2020, or January to April 2021.

The precise timing of the survey is subject to vessel availability, weather conditions and other operational considerations, and will take into account the seasonality of environmental sensitivities, where practicable.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago

FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago
FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago