Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Navy Seeks USACE’s Permit for Kennebec River Dredging
Dredging

July 24, 2019 · about 7 years ago

Navy Seeks USACE’s Permit for Kennebec River Dredging

The Department of the Navy in Bath, Maine, is seeking a permit from the U.S. Army Corps of Engineers to conduct work in waters of the U.S. in conjunction with periodic maintenance dredging of portions of the Kennebec River federal navigation channel in Bath and Phippsburg, Maine. According to the US

1 minutes read
  • LinkedIn
  • X
  • Email

The Department of the Navy in Bath, Maine, is seeking a permit from the U.S. Army Corps of Engineers to conduct work in waters of the U.S. in conjunction with periodic maintenance dredging of portions of the Kennebec River federal navigation channel in Bath and Phippsburg, Maine.

According to the USACE’s latest release, the Department is seeking a 10-year permit to conduct these works in order to facilitate the movement of U.S. naval ships constructed at Bath Iron Works (BIW) in and out of the river.

Based on historic shoaling rates and current and projected Navy shipbuilding schedules at BIW, maintenance dredging is anticipated to be needed and performed at about three-year intervals.

The first maintenance dredging event will occur during the winter of 2019/2020.

Under the plan, up to 80,000 cubic yards of predominantly sand would be periodically dredged from two locations that are prone to shoaling and have been dredged repeatedly in the past by USACE. Up to 50,000 cubic yards will be dredged off Doubling Point, within a 45-acre area to a depth of -32 feet mean lower low water (mllw) and disposed of in-river, off Bluff Head.

At the river mouth, up to 20,000 cubic yards will be dredged within a 31-acre area to a depth of -29 feet mllw and disposed of in the vicinity of Jackknife Ledge.

The deadline for submitting the comments on this plan is August 22, 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free