Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›WB Equipment Opts for SPX FLOW Motion Controller System
Dredging

July 25, 2019 · about 7 years ago

WB Equipment Opts for SPX FLOW Motion Controller System

When a damaged gear box on a large clamshell dredge needed repair, WB Equipment used the SPX FLOW Power Team Motion Controller System (MCS) to provide the necessary accuracy for this heavy, multi-point, synchronized lift. Weighing 1179 tons and with a 60-yard environmental bucket, the clamshell dred

2 minutes read
  • LinkedIn
  • X
  • Email

When a damaged gear box on a large clamshell dredge needed repair, WB Equipment used the SPX FLOW Power Team Motion Controller System (MCS) to provide the necessary accuracy for this heavy, multi-point, synchronized lift.

Weighing 1179 tons and with a 60-yard environmental bucket, the clamshell dredge is one of the larger dredging buckets in the Western Hemisphere.

One of the gear boxes used to turn the turret on the dredge was damaged when its bearing spacers were over-tightened. To enable repairs to be carried out safely, the unit needed to be removed and rebuilt, requiring the dredge to be lifted and counter weights applied.

To enable this, the weight and center of gravity of the boom needed to be determined so the dredge could be raised without toppling.

The initial weight calculation of the turret was 1,000,000 pounds. To lift this by 1”, four 400-ton single acting hydraulic cylinders were used, one at each corner.

WB Equipment selected these cylinders to give plenty of extra lift capacity and provide tolerance to any underestimation in tonnage. To determine various centers of gravity and realign the boom, three lifts were performed, each requiring extreme accuracy and precision. Each lift put the boom in various positions to see how this affected the center of gravity.

The weight of the turret was approximately 1,480,000 pound but the higher tonnage cylinders selected limited pressure to about 5200 psi, adding additional safety factor. The selection of these cylinders also had an added benefit of good fit for the corner lift points and jacking chairs.

The project took less than one day to setup and perform the lift operation. It was supported by four employees from the dredging company along with representatives from WB Equipment and SPX FLOW.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free