Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Meyer Werft Announces Float Out of Norwegian Encore
Shipbuilding

August 9, 2019 · about 7 years ago

Meyer Werft Announces Float Out of Norwegian Encore

Norwegian Encore is scheduled to leave Meyer Werft covered building dock II on August 17.

1 minutes read
  • LinkedIn
  • X
  • Email

Norwegian Cruise Line’s newest ship, Norwegian Encore, is scheduled to leave the covered building dock II at Meyer Werft shipyard in Papenburg on August 17, 2019, German shipbuilder said.

Once the 169,145 GT Norwegian Encore leaves the dock, it will berth at the shipyard’s outfitting pier to be fitted with its funnel cladding.

The newbuild will then remain in the shipyard port for further outfitting work and onboard trials until its passage through the river Ems up to the North Sea, which is expected to take place at end of September.

For Norwegian Encore to be able to berth at the outfitting pier, the floating section –engine room unit — of P&O’s Iona that is currently moored there will have to be moved to another berth in the shipyard port. After Norwegian Encore leaves dock, the floating part for Iona, which is due for completion in spring 2020, will be maneuvered back into the free covered building dock II for further construction work, Meyer Werft explained.

Being the fourth ship in the Breakaway Plus class, Norwegian Encore measures 333.46 meters in length and 41.4 meters in width, with capacity for 4,004 passengers.

The cruise vessel will offer seven-day cruises to the Eastern Caribbean from Miami beginning November 17, 2019, through April 12, 2020.

Image Courtesy: Meyer Werft

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free