Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Petrofac orders wellhead platform for Malaysian project from Muhibbah
Fossil Energy

August 28, 2019 · about 7 years ago

Petrofac orders wellhead platform for Malaysian project from Muhibbah

Muhibbah Engineering has received an award from Petrofac for the execution of the engineering, procurement, construction and installation (EPCI) of a wellhead platform (WHP) for East Cendor Field Development (Phase 1) project located offshore Malaysia.

1 minutes read
  • LinkedIn
  • X
  • Email

Malaysia-based Muhibbah Engineering has received an award from Petrofac for the execution of the engineering, procurement, construction and installation (EPCI) of a wellhead platform (WHP) for East Cendor Field Development (Phase 1) project located offshore Malaysia.

Muhibbah said in a Bursa Malaysia filing on Wednesday that the value of the contract was approximately RM150 million ($35.6M).

The company further said that the contract would involve a substructure, topsides, new full wellstream (FWS) export facilities including water injection, gas lift local power generation, chemical injection facilities, and communications via Digital Microwave Radio system for communications.

The oil, water, and gas FWS production will be exported to the Cendor floating production storage offloading (FPSO) for processing and gas lift and water injection supply will be from Cendor Wellhead Platform Bravo (CDW-B platform).

The contract is scheduled to start in the third quarter of 2019 and is expected to be completed within eleven months from the start date.

Petrofac is the operator of Block PM304, which contains the Cendor development. First oil from the field was achieved on September 23, 2006, just 16 months from sanction.

At the heart of the development is the Cendor Producer, which is a leased a Mobile Offshore Production Unit (MOPU).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free