Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Rotech Subsea Wraps Up IRM Cable Scope for NKT
Operations & Maintenance

September 10, 2019 · about 7 years ago

Rotech Subsea Wraps Up IRM Cable Scope for NKT

Rotech Subsea has competed inspection, repair and maintenance (IRM) scope in the German North Sea for NKT, a global cable player. The cable repair job saw Rotech mobilize its RS2 tool, a part of the new 2nd Generation RS non-contact CFE/J range of equipment. The company’s RSG grab tool was also depl

1 minutes read
  • LinkedIn
  • X
  • Email

Rotech Subsea has competed inspection, repair and maintenance (IRM) scope in the German North Sea for NKT, a global cable player.

The cable repair job saw Rotech mobilize its RS2 tool, a part of the new 2nd Generation RS non-contact CFE/J range of equipment. The company’s RSG grab tool was also deployed for the job on a 50Mhz interconnector.

“We were delighted to successfully complete this one month scope for NKT on budget and on schedule,” said Rotech Subsea director, Stephen Cochrane .

“Our presence in the German sector of the North Sea – and the success of the job – didn’t go unnoticed because as soon as the we had de-mobbed to Sweden we were immediately commissioned by another company to send our RS2 2nd Generation RS non-contact Controlled Flow Excavation tool straight back out into the field on an-other scope. I don’t think the equipment even touched the ground. It was transferred straight on to the awaiting trucks to travel to the next scope.

“It continues to be an incredibly busy year for us as word spreads of the capability of our range of unrivaled subsea excavation tools.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

50Hertz and Elia launch €752 million offshore HV cable jointing and repair logistics tender
Business & Finance

50Hertz and Elia launch €752 million offshore HV cable jointing and repair logistics tender

about 1 month ago

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago

FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

50Hertz and Elia launch €752 million offshore HV cable jointing and repair logistics tender
Business & Finance

50Hertz and Elia launch €752 million offshore HV cable jointing and repair logistics tender

about 1 month ago
Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago
FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago