Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Chinese shipbuilder orders TMC compressors for newbuild pipelayer
Equipment

September 19, 2019 · about 6 years ago

Chinese shipbuilder orders TMC compressors for newbuild pipelayer

Shanghai Zhenhua Heavy Industries (ZPMC) has placed an order with TMC Compressors for a complete marine compressed air system to a pipelay vessel under construction by the Chinese shipbuilder.

2 minutes read
  • LinkedIn
  • X
  • Email

Shanghai Zhenhua Heavy Industries (ZPMC) has placed an order with TMC Compressors for a complete marine compressed air system to a pipelay vessel under construction by the Chinese shipbuilder.

TMC said that it would supply a major marine compressed air system consisting of four working air compressors, four desiccant air dryers, two instrument air compressors, and desiccant air dryers, four starting air compressors, four high-pressure compressors for the vessel’s tensioning system, plus four high-pressure air dryers.

The company did not disclose the value of the contract but did describe the deal as “substantial.”

ZPMC’s newbuild is a JSD6000 derrick pipelay vessel with an overall length of 215.88 meters, a width of 49 meters, and draft of 10.83 meters.

It can accommodate 399 people and is equipped with 5,000 tonnes of full-slewing cranes, J-Lay and S-Lay two-type pipe laying system, eight-point positioning mooring system, and DP3 dynamic positioning system.

According to the company, the ship can effectively combine the two types of pipe laying systems, which can realize the single ship pipelaying operation under shallow water, deep water, and ultra-deepwater.

The laying pipe diameter covers 6-60 inches, and the pipe laying has a maximum water depth of 3,000 meters.

Spotted a typo? Have something more to add to the story? Maybe a nice photo? Contact our editorial team via email .

Also, i f you’re interested in showcasing your company, product or technology on Offshore Energy Today please contact us via our advertising form where you can also see our media kit.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Equipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago

Red Rock commissions Nexans Electra’s crane systems
Business Developments & Projects

Red Rock commissions Nexans Electra’s crane systems

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago
Red Rock commissions Nexans Electra’s crane systems
Business Developments & Projects

Red Rock commissions Nexans Electra’s crane systems

about 2 months ago