Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Jadestone Energy Finalizes Montara Umbilical Replacement
Equipment

September 26, 2019 · about 6 years ago

Jadestone Energy Finalizes Montara Umbilical Replacement

Jadestone Energy has completed installation of replacement subsea umbilical cables at the Montara complex, offshore Australia. The umbilical cables are an essential part of the control system of the Montara complex subsea wells, providing electrical power and control signals to the subsea well-heads

1 minutes read
  • LinkedIn
  • X
  • Email

Jadestone Energy has completed installation of replacement subsea umbilical cables at the Montara complex, offshore Australia.

The umbilical cables are an essential part of the control system of the Montara complex subsea wells, providing electrical power and control signals to the subsea well-heads.

The replacement umbilical is expected to provide reliable operations for the remaining life of the field.

This project was identified by the previous operator PTTEP as a high priority, however the work was deferred until operatorship was transferred.

The replacement umbilical cables were installed using the DOF Subsea vessel Skandi Hercules, which was mobilized in Singapore in August, and completed work infield at Montara in September.

Paul Blakeley , president and CEO said: “I’m pleased to have completed this major capital project as the operator of Montara, safely, and on budget. Early on, we recognized the need to replace the control link to the Montara subsea wells, and this was done as soon as possible, following acceptance of Jadestone’s safety case for Montara. I think of this as a one-off maintenance project, and having it completed now will provide greater confidence in our ability to deliver guidance volumes from Montara.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

ACUA's Pioneer USV in Plymouth Sound; Source: ACUA Ocean
Automation

UK’s testbed on the lookout for partners after spotlighting subsea range with multi-robot demo

about 1 month ago

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

ACUA's Pioneer USV in Plymouth Sound; Source: ACUA Ocean
Automation

UK’s testbed on the lookout for partners after spotlighting subsea range with multi-robot demo

about 1 month ago
Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago