Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›FERC delivers draft supplemental EIS for Magnolia LNG
News

September 30, 2019 · about 6 years ago

FERC delivers draft supplemental EIS for Magnolia LNG

The U.S. Federal Energy Regulatory Commission (FERC) issued the draft supplemental environmental impact statement (DEIS) for the production capacity amendment to LNGL’s Magnolia LNG project on September 27, 2019.

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Federal Energy Regulatory Commission (FERC) issued the draft supplemental environmental impact statement (DEIS) for the production capacity amendment to LNGL’s Magnolia LNG project on September 27, 2019.

LNGL said on Monday that Magnolia LNG’s production capacity amendment, filed with FERC on November 19, 2018, would increase the total authorized production capacity of Magnolia from the currently authorized 8 mtpa to 8.8 mtpa.

In the supplemental DEIS, FERC said: “ The modifications associated with the production capacity amendment, with the additional mitigation measures recommended in the supplemental EIS, would continue to avoid or reduce impacts to less than significant levels.

“ There would be no substantive change in construction noise or air emissions from that previously analyzed in the Commission’s EIS for the Magnolia LNG Project and modeling demonstrates there would be no exceedances of the National Ambient Air Quality Standards. ”

In completing the work necessary to issue the supplemental DEIS, FERC analyzed publicly available data and data provided by Magnolia LNG associated with the construction and operation of the Magnolia LNG project.

FERC set November 18 as the deadline for receipt of public comments on the supplemental DEIS while the supplemental Final Environmental Impact Statement (FEIS) is expected to be issued by the commission on or before January 24, 2020.

LNGL managing director and CEO Greg Vesey said: “ […] we are pleased with the findings in the draft supplemental environmental impact statement. The LNGL team looks forward to our continued work with FERC to enable us to receive the FEIS on schedule in January 2020. “

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago