Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›West Delta LNG files for MARAD, USCG permits
Clean Fuel

October 1, 2019 · about 7 years ago

West Delta LNG files for MARAD, USCG permits

The Maritime Administration (MARAD) and the U.S. Coast Guard (USCG) have received an application from West Delta LNG for the licensing of a deepwater port.

2 minutes read
  • LinkedIn
  • X
  • Email

The Maritime Administration (MARAD) and the U.S. Coast Guard (USCG) have received an application from West Delta LNG for the licensing of a deepwater port.

The application proposes the ownership, construction, operation and eventual decommissioning of a deepwater port terminal in the Gulf of Mexico to export domestically produced natural gas.

In the nominal design case, the Venice pretreatment plant would process approximately 750 million standard cubic feet per day (mmscfd) of feed natural gas for the proposed West Delta LNG deepwater port.

Based on an estimated production unit availability of 95.4 percent and an allowance for the consumption of feed gas during the liquefaction process, the proposed West Delta LNG deepwater port would nominally produce 5.0 mmtpa of LNG for export.

In the optimized case, the proposed project would process approximately 900 mmscfd of feed natural gas to produce approximately 6.1 mmtpa of liquefied natural gas for export, or the equivalent of 306 billion standard cubic feet per year of LNG.

The project would be capable of accommodating LNG tankers with the cargo capacity ranging from 30,000 cubic meters to 180,000 cubic meters of the chilled fuel.

The West Delta LNG deepwater port offshore and marine components would consist of an LNG production and storage unit, a loading platform and marine berth unit and support facilities.

The West Delta LNG deepwater port onshore components would consist of the proposed Venice pretreatment plant, which would be located in Plaquemines Parish, Louisiana within the grounds of an existing 121-acre onshore natural gas processing facility known as the Venice gas complex.

The Venice pretreatment plant would receive natural gas from offshore Gulf of Mexico midstream pipelines and/or interstate pipeline feed gas from pipelines already interconnected with the Venice gas complex.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free