Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Technology›Haliade X- 12MW Prototype Stands Complete
Technology

October 17, 2019 · about 6 years ago

Haliade X- 12MW Prototype Stands Complete

The third and final 107m blade has been installed on the prototype GE Haliade-X 12MW offshore wind turbine in Maasvlakte, the Port of Rotterdam. The first blade was installed on the Haliade-X 12MW turbine located at Sif’s Maasvlakte 2 terminal on 14 October, with the second piece following the day l

1 minutes read
  • LinkedIn
  • X
  • Email

The third and final 107m blade has been installed on the prototype GE Haliade-X 12MW offshore wind turbine in Maasvlakte, the Port of Rotterdam.

The first blade was installed on the Haliade-X 12MW turbine located at Sif’s Maasvlakte 2 terminal on 14 October, with the second piece following the day later.

LM Wind Power manufactured the 107m blades, the world’s largest, at its plant in Cherbourg, France. The first piece was rolled out in June.

GE Renewable Energy decided to install the Haliade-X 12MW onshore to facilitate access for testing. It is expected to allow the collection of data during the initial period of operations which is necessary to obtain the Type Certificate in 2020 and ship first commercial units in 2021.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Technology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free