Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Rongxin Huiko Electric to Supply Rudong OWF Converter
Business & Finance

October 17, 2019 · about 6 years ago

Rongxin Huiko Electric to Supply Rudong OWF Converter

Rongxin Huiko Electric (RXHK) has won a contract to supply a set of converter valves for the onshore converter station of the Rudong offshore wind demonstration project in China. RXHK will supply ±400kV 1,100MW VSC HVDC converter valves for the station, including all insulators and AC-DC hardware fi

1 minutes read
  • LinkedIn
  • X
  • Email

Rongxin Huiko Electric (RXHK) has won a contract to supply a set of converter valves for the onshore converter station of the Rudong offshore wind demonstration project in China.

RXHK will supply ±400kV 1,100MW VSC HVDC converter valves for the station, including all insulators and AC-DC hardware fittings, together with the valve cooling and auxiliary system, control system, access platform for maintenance, spare parts and special tools.

The equipment is scheduled to be delivered to the site by September 2020.

The Rudong offshore wind farm HVDC demonstration project is located in the southeast of Jiangsu Province on the northern edge of the Yangtze River Delta.

The project, with a total installed capacity of 1,100MW, comprises three wind farms, which are owned by China General Nuclear Power Corp (CGN) Nantong Ltd and China Three Gorges (CTG) New Energy Corp Nantong and Rudong Ltd.

Electric power generated by the wind farms is transmitted to three separate offshore AC substations via 35kV cable and transformed to 220kV before it is further transmitted to the offshore converter station.

The power is converted to DC and then transmitted to an onshore converter station via a single, two core ±400kV cable. After being converted to 500kV AC in the onshore converter station, the power flows into the China State Grid Jiangsu power network.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago