Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Buzzard field shut down again due to pipework defect
Fossil Energy

October 18, 2019 · about 7 years ago

Buzzard field shut down again due to pipework defect

CNOOC Petroleum Europe Limited has shut down its Buzzard field, located in the UK sector of the North Sea, for the second time in two weeks due to pipework defect.

2 minutes read
  • LinkedIn
  • X
  • Email

CNOOC Petroleum Europe Limited, a subsidiary of CNOOC Limited, has confirmed it has shut down its Buzzard field, located in the UK North Sea, for the second time in two weeks due to pipework defect.

According to a report by Reuters, the Buzzard field was shut earlier this month for repairs.

Following repairs, the field restarted production, however, it had to be shut down again.

In an email to Offshore Energy Today, CNOOC on Friday confirmed it took a safe, temporary shutdown of its Buzzard installation at around 9:05 am on Wednesday, October 16.

A spokesperson for the company said: “A defect on topsides pipework was repaired last week and production safely restarted. A routine follow-up inspection identified that the integrity of the repair was subsequently compromised.”

“There is no harm to people, the environment or the asset,” the company noted.

The company further said that an alternative repair option was being progressed.

Normal operations are expected to resume once the repair is complete.

Located about 96 kilometers northeast of Aberdeen, in approximately 96 meters of water, the Buzzard asset is the UK’s highest-producing field.

In 2017, CNOOC announced the Buzzard Phase II project. The project was sanctioned in August 2018 . It involves the construction of a subsea development approximately five kilometers north-east of the Buzzard platform. This will comprise a 12-slot production and water injection subsea manifold that will be tied back to the existing Buzzard complex. First oil is expected in 2021.

CNOOC Petroleum Europe Limited is the operating partner of Buzzard (43.21%), with Suncor Energy (29.89%), Chrysaor (21.73%), Dyas Exploration UK Limited (4.70%), and Oranje-Nassau Energie Resources Limited (0.46%) also holding interests in the field and its facilities.

Offshore Energy Today Staff

Spotted a typo? Have something more to add to the story? Maybe a nice photo? Contact our editorial team via email .

Also, i f you’re interested in showcasing your company, product or technology on Offshore Energy Today, please contact us via our advertising form where you can also see our media kit.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free