Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›FERC grants permit for Cameron LNG Train 2 commissioning start
News

October 21, 2019 · about 6 years ago

FERC grants permit for Cameron LNG Train 2 commissioning start

The United States Federal Energy Regulatory Commission (FERC) granted Sempra Energy to start the commissioning process of the second liquefaction train at the Cameron LNG plant in Hackberry, Louisiana.

1 minutes read
  • LinkedIn
  • X
  • Email

The United States Federal Energy Regulatory Commission (FERC) granted Sempra Energy to start the commissioning process of the second liquefaction train at the Cameron LNG plant in Hackberry, Louisiana.

FERC granted the permit for the variance request related to the commissioning procedures for the Train 2 MR and PR gas turbine solo runs, and to introduce hazardous fluids and commission the Train 2 ISBL hot oil system and to introduce hazardous fluids and commission the Train 2 PR gas turbine.

FERC noted in its order that Cameron LNG must comply with all applicable remaining terms and conditions of the order, as well as procedures stipulated in your previous filings and that this approval does not grant Cameron LNG the authority to introduce hazardous fluids or commission other project facilities at the LNG terminal.

Cameron LNG is jointly owned by affiliates of Sempra LNG, Total, Mitsui, and Japan LNG Investment. Sempra Energy indirectly owns 50.2 percent of Cameron LNG.

The project includes three liquefaction trains with a projected export capacity of more than 12 million tonnes per annum of LNG, or approximately 1.7 billion cubic feet per day.

Train 2 and Train 3 are expected to begin producing liquefied natural gas (LNG) in the first quarter of 2020 and the second quarter of 2020, respectively.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago