Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›EEW OSB Loads Out First Borssele 1+2 Transition Pieces
Wind Farms

October 22, 2019 · about 7 years ago

EEW OSB Loads Out First Borssele 1+2 Transition Pieces

EEW Offshore Structures Britain (OSB) has completed the load-out of the first six transition pieces built for the Borssele 1+2 offshore wind farm in the Dutch North Sea. The Teesside-based company will manufacture and deliver a total of 35 transition pieces for Ørsted’s 752MW wind farm. ALE Heavy Li

1 minutes read
  • LinkedIn
  • X
  • Email

EEW Offshore Structures Britain (OSB) has completed the load-out of the first six transition pieces built for the Borssele 1+2 offshore wind farm in the Dutch North Sea.

The Teesside-based company will manufacture and deliver a total of 35 transition pieces for Ørsted’s 752MW wind farm. ALE Heavy Lift is providing the transportation services. Denmark’s Bladt Industries is in charge of manufacturing and delivering the remaining 59 transition pieces.

EEW SPC, the parent company of EEW OSB, will deliver 47 monopiles for the wind farm. Dutch offshore foundations specialist Sif Holding will produce the remaining 47 monopiles.

47 monopiles, 94 transition pieces, and 94 anode cages will be shipped from Denmark, Germany, and the UK to Maasvlakte 2 in the Port of Rotterdam , where they will be assembled and prepared for offshore construction.

GeoSea, part of DEME Offshore, is in charge of transporting and installing the monopile foundations.

The Borssele 1+2 offshore wind farm will comprise 94 Siemens Gamesa 8MW turbines installed some 23km off the coast of Zeeland. A2SEA, part of GeoSea, will provide installation vessel capacity to transport and install the wind turbines.

Ørsted plans to have the project commissioned by the end of 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free