Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›EEW OSB Loads Out First Borssele 1+2 Transition Pieces
News

October 22, 2019 · about 6 years ago

EEW OSB Loads Out First Borssele 1+2 Transition Pieces

EEW Offshore Structures Britain (OSB) has completed the load-out of the first six transition pieces built for the Borssele 1+2 offshore wind farm in the Dutch North Sea. The Teesside-based company will manufacture and deliver a total of 35 transition pieces for Ørsted’s 752MW wind farm. ALE Heavy Li

1 minutes read
  • LinkedIn
  • X
  • Email

EEW Offshore Structures Britain (OSB) has completed the load-out of the first six transition pieces built for the Borssele 1+2 offshore wind farm in the Dutch North Sea.

The Teesside-based company will manufacture and deliver a total of 35 transition pieces for Ørsted’s 752MW wind farm. ALE Heavy Lift is providing the transportation services. Denmark’s Bladt Industries is in charge of manufacturing and delivering the remaining 59 transition pieces.

EEW SPC, the parent company of EEW OSB, will deliver 47 monopiles for the wind farm. Dutch offshore foundations specialist Sif Holding will produce the remaining 47 monopiles.

47 monopiles, 94 transition pieces, and 94 anode cages will be shipped from Denmark, Germany, and the UK to Maasvlakte 2 in the Port of Rotterdam , where they will be assembled and prepared for offshore construction.

GeoSea, part of DEME Offshore, is in charge of transporting and installing the monopile foundations.

The Borssele 1+2 offshore wind farm will comprise 94 Siemens Gamesa 8MW turbines installed some 23km off the coast of Zeeland. A2SEA, part of GeoSea, will provide installation vessel capacity to transport and install the wind turbines.

Ørsted plans to have the project commissioned by the end of 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago