Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›First Subsea CPSs for Kincardine Floating Wind Farm
News

October 23, 2019 · about 6 years ago

First Subsea CPSs for Kincardine Floating Wind Farm

First Subsea has secured a second contract with Spain’s Cobra Group to provide Cable Protection Systems (CPSs) for the 50MW Kincardine floating wind farm offshore Scotland. First Subsea provided CPSs for the first Kincardine floating wind turbine which was installed 15 kilometres off the coast, sout

1 minutes read
  • LinkedIn
  • X
  • Email

First Subsea has secured a second contract with Spain’s Cobra Group to provide Cable Protection Systems (CPSs) for the 50MW Kincardine floating wind farm offshore Scotland.

First Subsea provided CPSs for the first Kincardine floating wind turbine which was installed 15 kilometres off the coast, south of Aberdeen, last year. The company will now provide a further eleven CPSs for the wind farm.

First Subsea’s CPS combines a mechanical diver-less subsea connector and polyurethane bend stiffener that is connected to the floater during the pull-in of the electrical power cable.

During operation lifespan of a wind farm, the CPS stiffens the cable at the point of entry and protects the cable from the effect of bending moments caused by the dynamic conditions offshore.

The Lancaster-based company will also deliver platform mooring connectors for the wind farm.

Once fully built, the 50MW Kincardine will comprise one 2MW and five MHI Vestas 9.6MW floating wind turbines. The 2MW unit has been operating offshore Aberdeen since October 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago